17 Jan 2018 – 12:09

Ashghal begins demolishing bridge over Mesaimeer Roundabout

The temporary bridge being demolished. Pic by: Salim Matramkot/The Peninsula

The Peninsula

Ashghal began the revamp of Mesaimeer (Leabidly) Roundabout with the demolition of the temporary bridge over it, changing it into a multi-level interchange.

The detour that came in to affect over the weekend will last for two years. The traffic route has changed on on E-Ring Road leading from Doha and Industrial Area as well as from Doha Expressway to E-Ring Road, Rawdat Al Khail Street and Industrial Area.

qatar airways

Road users travelling from Doha Expressway towards Industrial Area, E-Ring Road or Rawdat Al Khail Street can take right prior to Leabidly Roundabout onto a newly built road towards Industrial Area Road, where a fresh light signal was installed to control traffic in all directions involving E-Ring Road.

Road users travelling from E-Ring Road towards Industrial Area can use the recently-installed light signal before Leabidly Roundabout and take left onto the new route towards Industrial Area Road.

Road users travelling from Rawdat Al Khail Street towards Industrial Area can use Leabidly Roundabout then turn left onto the third exit and turn right via the next signal towards Industrial Area Road.

Also, road users travelling from Rawdat Al Khail Street towards Industrial Area can turn right at Leabidly Roundabout onto the next light signal then perform a U-turn towards the new route and the Industrial Area Route.

LEAVE A REPLY